Description
Location
Features
Taxes & Fees
Energy Certificate
Description
YOUR DREAM HOME
Discover the perfect villa where design, quality, and comfort come together to offer you an unparalleled lifestyle.
It will have all the necessary utilities, including water and electricity supply, installation of a photovoltaic panel system for self-consumption of electric energy, and a wastewater treatment system using a biological oxidation purifier.
It will feature high-quality finishes and an extensive luxury specification list.
Equipped with a 8×4 swimming pool with an outdoor shower, porcelain perimeter around the pool, pre-installation for heating, barbecue area with toilet facilities, enclosed garage with an automatic door and included motor, pre-installation for an electric charging point, landscaped area with artificial turf, motorized automatic access gate to the plot (including motor), and a natural stone-clad wall.
***Notes:
• Upon full completion of the project, the final construction report and water and electricity certifications will be delivered.
• The construction completion timeline, once the building permit is obtained, depends on the size of the property and its annexes:
8–10 months for single-story Insulated Slab homes
12–14 months for single-story homes With Structure
12–14 months for two-story Insulated Slab homes
15–18 months for two-story homes With Structure
• The construction will be carried out as a SELF-DEVELOPMENT project.
Discover the perfect villa where design, quality, and comfort come together to offer you an unparalleled lifestyle.
It will have all the necessary utilities, including water and electricity supply, installation of a photovoltaic panel system for self-consumption of electric energy, and a wastewater treatment system using a biological oxidation purifier.
It will feature high-quality finishes and an extensive luxury specification list.
Equipped with a 8×4 swimming pool with an outdoor shower, porcelain perimeter around the pool, pre-installation for heating, barbecue area with toilet facilities, enclosed garage with an automatic door and included motor, pre-installation for an electric charging point, landscaped area with artificial turf, motorized automatic access gate to the plot (including motor), and a natural stone-clad wall.
***Notes:
• Upon full completion of the project, the final construction report and water and electricity certifications will be delivered.
• The construction completion timeline, once the building permit is obtained, depends on the size of the property and its annexes:
8–10 months for single-story Insulated Slab homes
12–14 months for single-story homes With Structure
12–14 months for two-story Insulated Slab homes
15–18 months for two-story homes With Structure
• The construction will be carried out as a SELF-DEVELOPMENT project.
Location
Features
Features
Covered Terrace
Private Terrace
Storage Room
Fitted Wardrobes
Barbeque
Climate Control
Pre Installed A/C
Views
Mountain
Garden
Pool
Condition
New Construction
Pool
Private
Kitchen
Fully Fitted
Kitchen-Lounge
Garden
Private
Landscaped
Security
Entry Phone
Parking
Garage
Private
EV charge point
Utilities
Photovoltaic solar panels
Category
New Development
Taxes & Fees
Community Fees: €0 / monthly
Basura Tax: €0 / annually
IBI Fees: €0 / annually
Basura Tax: €0 / annually
IBI Fees: €0 / annually
Energy Certificate
